Cadillac for a Cause

CHOICE OF 2017 CADILLAC ATS, CT6, XT5, OR ESCALADE
(VALUE OF $50,000 INCLUDING SALES TAX. VALUE MAY ALSO BE APPLIED TOWARD THE PURCHASE OF A VEHICLE OF HIGHER VALUE)

DRAWING TO BENEFIT THE COMMUNITY CHRISTIAN SCHOOL ATHLETIC FIELDS

Community Christian School is in the process of building an Athletic Complex. Your support of the Cadillac for a Cause fundraiser helps us get one step closer to realizing our dream. If you would like more information on the fields and the work to be completed, please email becky.dean@communitychristianschool.net. Thank you for your support!

Last Year's Winner!

Creation of the Community Christian School Athletic Fields (Fall 2017)

CCS started with 12 acres of heavily wooded terrain and has done the following work:

  • cleared the wooded areas of the property
  • secured topographical reports and hydrological studies, along with various construction and engineering plans and documents, and numerous permits and surveys
  • purchased several required maintenance bonds and paid various legal fees
  • demolished and cleared 2 old homes, a garage and 2 paved driveways
  • constructed a storm water piping extension, a structural drainage system and a detention pond
  • did extensive grading of the entire property, along with fine lazar grading for the main football/soccer field
  • constructed a retaining wall for our bleacher area
  • purchased a large set of bleachers
  • secured an LED Scoreboard which will be reconditioned and installed this fall
  • created a landscape buffer and berm around the 12 acre property
  • dug a well for the property
  • did extensive sodding and seeding of the fields, and landscaped areas with plants and trees
  • relocated and expanded an internal gravel road on property
  • concreted the front entrance and a small parking lot, and added required curbing
  • installed an underground sprinkler system
  • purchased 2.1 additional acres of connecting property for future expansion
  • constructed 20 lighted, brick columns along the front entrance of the property
  • widened required sidewalks on the walkway to the school
  • installed goal posts on the football field

Upcoming work on the fields:

  • installation of the front entrance gate and pedestrian gate this fall
  • bleachers will be reconditioned and assembled this fall
  • scoreboard will be reconditioned and installed this fall
  • top-dressing of the main game field will be done this fall

Additional work needed to be done:

  • construction of permanent rest rooms facilities
  • construction of a concession stand and press box
  • purchase and installation of lights and a sound system
  • construction of a storage building and locker facilities
  • additional fencing will need to be added around the exterior of the property