Menu
[siteorigin_widget class=”WP_Widget_Media_Image”][/siteorigin_widget]

Cadillac for a Cause

[siteorigin_widget class=”WP_Widget_Media_Image”][/siteorigin_widget]

Your past support of our two Cadillac for a Cause fundraisers has helped us get one step closer to realizing our dream.  We thank you for your support!

[siteorigin_widget class=”WP_Widget_Media_Image”][/siteorigin_widget]
[siteorigin_widget class=”WP_Widget_Media_Image”][/siteorigin_widget]

Creation of the Community Christian School Athletic Fields (Fall 2017)

CCS started with 12 acres of heavily wooded terrain.

The following work has already been done:

  • cleared the wooded areas of the property
  • secured topographical reports and hydrological studies, along with various construction and engineering plans and documents, and numerous permits and surveys
  • purchased several required maintenance bonds and paid various legal fees
  • demolished and cleared 2 old homes, a garage and 2 paved driveways
  • constructed a storm water piping extension, a structural drainage system and a detention pond
  • did extensive grading of the entire property, along with fine lazar grading for the main football/soccer field
  • constructed a retaining wall for our bleacher area
  • purchased a large set of bleachers
  • secured an LED Scoreboard which will be reconditioned and installed
  • created a landscape buffer and berm around the 12 acre property
  • dug a well for the property
  • did extensive sodding and seeding of the fields, and landscaped areas with plants and trees
  • relocated and expanded an internal gravel road on property
  • concreted the front entrance and a small parking lot, and added required curbing
  • installed an underground sprinkler system
  • purchased 2.1 additional acres of connecting property for future expansion
  • constructed 20 lighted, brick columns along the front entrance of the property
  • widened required sidewalks on the walkway to the school
  • installed goal posts on the football field

Additional work needed to be done:

  • construction of permanent restroom facilities
  • construction of concession stand and press box
  • purchase and installation of a sound system
  • construction of a storage building and locker facilities

School Closings

We are temporarily closed as a result of COVID-19.

Remote Learning will begin on March 30th. During this time, all other school activities and events will be suspended until further notice. Updates will be posted on the families page as well as via email.

Our admissions office is still taking applications and can be reached by filling out the form on our admissions page. You will receive a response within 48 business hours.